Capture across construction
Preserve a better record of spatial information as the project takes shape.
Different stages of construction create different opportunities for 3D Capture. Use it to review under-slab MEP placement, compare framing to the design, document visible building systems, and create a lasting record of the project.
Document the foundation
Before concrete is placed.
A pre-slab Capture provides a detailed record of visible under-slab MEPs before the pour, giving the project team an opportunity to review locations and identify missing or misplaced components before corrections become costly.
Preserve MEP locations
While walls are still open.
A rough-in Capture creates a measurable record of visible MEP systems before close-in. Project teams can use it to confirm locations, coordinate subsequent work, investigate conflicts, and reference what was installed after walls and ceilings are finished.
Support quality control
Compare what was built with what was designed.
A framing Capture provides a measurable record that the project team can compare against the Construction Documents. This helps identify potential wall placement discrepancies early, giving the builder better information before the next trades move in.
Create a project record
From construction through completion.
Capture selected stages throughout construction to create a lasting record of the project. Give the team a reliable resource for closeout, owner questions, warranty work, and future reference.